Below is a list of the typical time that it takes to do a job. These times may vary and if the job you are looking for isn't on the list then give us a call and we can give you a timescale. 

  • Prepare and paint 1 x coat on cupboard door = 30 mins
  • Prepare and paint 1 x coat on both sides of a wood-panelled door = 1 hour
  • Prepare and paint 1 x coat on wall (2.4m high x 4m wide) = 2-3 hours
  • Prepare and protect floors, walls and ceilings (medium room) = 0.5 days
  • Paint 1 x coat on walls and ceiling (medium room) = 0.5 days
  • Paint 1 x coat on woodwork of (medium room) = 0.5 days